Water Descaler
Buy Now - Click Here

Installation

A Scale Manager 2 kit comprises of the following:

  • One electronic descaler 
  • One voltage transformer (240v -15v AC)
  • Antenna cable with red plug
  • Antenna cable with black plug
  • Five plastic cable ties (1 spare)
  • One attachable Black antenna plug
  • One attachable Red antenna plug

Please Note: -  Ensure antennae cables do not come into contact with each other

  • Ideally a 125mm +(5"+) straight run of pipe is required for each antenna coil
  • Direction of Water Flow is immaterial
  • Connect red plugs to red sockets and black to black
  • Scale Manager II is effective on all pipes (copper, plastic, lead, steel etc)­
  • Performance is not impaired if the pipe is painted
  • The Control Unit can be fitted at any angle or plane
  • A 13-amp socket is required for the transformer

The ideal location to install Scale Manager 2 is near the entry point of the rising main, before any junctions.  The antennae coils operate independently, and can be positioned on separate pipes should you not have an uninterrupted pipe run of 250mm (10").  Should the inlet pipe T off within 125mm of the stopcock, position the coils as fig 1.  If the inlet pipe available is over 125mm (5") but under 250mm (10") position as fig 2 (one coil in the centre before the T, and the other on the pipe with the highest consumption).

The antennae coils require a minimum gap between them of 50mm (2").  It is also necessary that the coils are at least 40mm (1½") from elbows, joints or junctions

Fitting:- The diagram below may be of assistance.

  1. Position the Scale Manager 2 control unit close to the water inlet pipe, allowing sufficient space to connect the antennae and power plugs.
  2. Connect the RED plugged antenna to a RED socket marked OUT Red
  3. Pass the antenna cable over the front of the pipe
  4. Attach using a cable tie 
  5. Closely coil the wire around the pipe 12 times in the direction of the arrows
  6. Tighten the coil and secure with a cable tie. 
  7. Leave sufficient wire to reach the remaining RED socket - trim off the excess. Connect the lose RED antenna plug to the cable by pulling off the plastic insulation cover (pliers may be needed) - thread wire through the insulation cover - trim off 5mm (¼") of insulation from the wire - connect to the plug via the screw terminal - replace the insulation cover - connect to the RED socket on the control unit.
  8. Repeat the above with the BLACK plugged antenna starting at 2. (Connect the BLACK plugged antenna to the BLACK socket marked OUT Black)
  9. Plug the transformer into a 13-amp socket, connect to the socket on the control unit and switch on.

The power LED will illuminate pulsing for 7 seconds whilst carrying out a self-diagnostic routine. The R.F. & D.I.C de-scaling bar graph LED's will then illuminate showing de-scaling is in progress, and will cycle at a rate of 1.26 seconds.  Each LED represents 650 magnetic pulses, totalling 6,500 per second through each of the antenna coils.

Click here for a printable .doc version